Hợp kim hay không
Không hợp kim
Thời Gian giao hàng
8-14 Ngày
Chế Biến Dịch Vụ
Uốn, Hàn, Cắt, Đục Lỗ
Payment Term
30% Tt Deposit, Balance Against Bl Copy
Ut Standard
Sep 1921-84 D/D
Non-Metallic Inclusiton
ASTM E45
Technology
Forged/Hot Rolled/Cold Drawn
Certificate
ISO, ABS, BV, CCS, Dnv, Lr, Gl, Mill Certificate
Quality Inspection
Ut, Chemical Composition, Physical Properties
Other shapes
Steel Ppie/Flat/Plate